MTU

MTU 6R0185 GS200

200 kW standby / 175 kW prime · Natural Gas / LPG · Liquid-cooled

200 kW natural gas standby generator with Doosan 11.1L CAC 6-cylinder inline turbocharged engine, EPA certified 3-way catalyst, dual NG/LP vapor capable.

Standby power
200 kW / 175 kW prime
Voltage options
120/240V, 120/208V, 277/480V, 347/600V
Frequency / Phase
60 Hz · 1/3-phase
Engine
Doosan 11.1L CAC · 11.1L
EPA / Emissions
EPA Non-Road Spark Ignition
Commerciallight-industrialdata-center-edgedual-fuel-standby
Configure & QuoteDownload spec sheet

Overview#

The MTU 6R0185 GS200 is a 200 kW natural gas standby generator set powered by a Doosan 11.1L CAC — an 11.1-liter, 6-cylinder inline turbocharged and charge-air-cooled spark-ignition engine producing up to 225 kWm gross on natural gas. This is the most powerful unit in MTU's 6-cylinder inline gas generator lineup and sits at the upper boundary of what the 6R-series gas platform can deliver.

On liquid propane vapor, the rated output drops to 130 kW standby — a 35% reduction from the NG rating. LP installations should be carefully sized to account for this derating. The engine is EPA certified with a 3-way catalyst and uses a Bosch electronic isochronous governor (±0.5% speed regulation). Standard equipment includes a 24V electric start, unit-mounted radiator rated for 50°C ambient, and the MTU digital control panel with SAE J1939 communications and NFPA 110 compatibility.

The GS200 shares the same footprint length (142 in) as the GS150 but is taller due to the larger 11.1L engine block, weighing in at 3,096 kg — plan accordingly for structural and seismic loading during site design.

Technical Specifications#

Power Ratings (60 Hz, 1800 rpm)

RatingkWkVA
Standby — NG200250
Prime — NG175219
Standby — LP130162

Engine — Doosan 11.1L CAC

ParameterValue
Displacement11.1 L (673 in³)
Configuration6-cylinder inline
AspirationTurbocharged and charge-air-cooled
Rated speed1800 rpm
GovernorBosch electronic isochronous, ±0.5%
Max gross power (NG)225 kWm (302 bhp)
Max gross power (LP)155 kWm (208 bhp)
EmissionsEPA certified, 3-way catalyst
Starting24V electric, 1,050 CCA

Fuel Consumption (natural gas at 1000 BTU/ft³)

LoadNG ConsumptionLP Consumption
100% load2,115 ft³/hr (59.9 m³/hr)704 ft³/hr
75% load1,648 ft³/hr (46.7 m³/hr)600 ft³/hr
50% load1,157 ft³/hr (32.8 m³/hr)404 ft³/hr

Physical (Open Power Unit)

DimensionValue
Length3,607 mm (142 in)
Width1,591 mm (62.6 in)
Height2,026 mm (79.75 in)
Dry weight3,096 kg (6,258 lb)

Cooling System

ParameterValue
Radiator ambient rating50°C (122°F)
Water pump capacity310 L/min (82 gpm)
Heat rejection to coolant194.6 kW

Our Service Experience#

The Doosan 11.1L CAC is the largest engine in MTU's 6R gas generator series and operates at high specific output — 225 kWm from 11.1 liters means relatively high cylinder pressures and temperatures. This engine rewards consistent service intervals: oil quality degrades faster at high load factor, and the charge air cooler should be inspected at every annual service for internal leaks and external fin blockage.

At 200 kW, natural gas supply infrastructure sizing becomes important. The unit requires 2,115 ft³/hr at 100% load — for a building with multiple gas appliances running simultaneously, confirm that the utility service has adequate delivery capacity and that the generator fuel inlet pressure remains within 7–11 inches of water column under maximum simultaneous demand.

Frequently Asked Questions#

What is the LP derating on the GS200? On liquid propane vapor, the GS200 is rated at 130 kW standby — a 35% reduction from the 200 kW NG rating. This is the largest LP derating in the 6R gas series. If LP is your primary or backup fuel, size the unit at 130 kW output for worst-case planning.

How does the GS200 compare to the diesel DS200? Both provide 200 kW standby but serve different fuel infrastructure situations. The diesel DS200 is more compact and has higher fuel energy density per gallon, but requires diesel fuel storage infrastructure. The GS200 eliminates diesel storage and uses utility gas supply. The GS200 is also significantly heavier (6,258 vs. ~3,500 lb) and larger.

What gas supply pressure is required? Vaporous supply (NG or LP vapor): 178–279 mm H₂O (7–11 inches of water column). The 2" NPT inlet connection handles the higher flow rate required at 200 kW.

Is the GS200 available with UL 2200 listing? Yes, UL 2200 and CSA certification are available as options for the 208V and 240V voltage configurations.

What warranty does the GS200 carry? Standard 2-year factory warranty through MTU Onsite Energy authorized distributors.#

Engineering specifications

Physical

Length
142 in
Width
63 in
Height
80 in
Dry weight
6,258 lb

Documents & downloads

Spec sheets & manuals

Ready to order this model?

Configure your MTU 6R0185 GS200

Lock the enclosure, fuel system, transfer switch, and add-ons — we'll confirm pricing, availability, and lead time within one business day. Prefer a free-form quote? That option is still here.

Estimate runtime for the MTU 6R0185 GS200

Adjust load percent and tank size to estimate runtime. Pre-filled with this model's spec where available.

Estimate runtime on this tank

Fuel demand at 75% load

2,100,000 BTU/hr2100.0 cf/min @ 1,000 BTU/cf

On utility natural gas the runtime is generally unlimited provided the supply line and meter can deliver this BTU/hr at the engine's required inlet pressure (typically 5–14" WC residential, up to 5 psi commercial). Confirm against the OEM's published fuel-pressure spec.

Service intervals

Manufacturer-recommended intervals for the MTU 6R0185 GS200 under standby duty. Field intervals may differ based on load profile, ambient conditions, and fuel quality.

Oil & filter
Every 500 hours
Major overhaul
20,000 hours

Common failure modes

What we've seen fail on this platform. Use as a service-planning reference, not a diagnostic — actual failure modes depend heavily on duty cycle and maintenance history.

ComponentSymptomTypical hoursSeverity
3-way catalystCatalyst efficiency degradation over time — annual emissions testing recommendedminor
Charge air coolerCoolant ingestion into intake, immediate power loss, white smoke — shutdown requiredsevere
24V battery bankInsufficient CCA after extended standby, failed cranking — 1050 CCA required per batterymoderate

Frequently Asked Questions

What is the LP derating on the GS200?
On liquid propane vapor, the GS200 is rated at 130 kW standby — a 35% reduction from the 200 kW NG rating. This is the largest LP derating in the 6R gas series. If LP is your primary or backup fuel, size the unit at 130 kW output for worst-case planning.
How does the GS200 compare to the diesel DS200?
Both provide 200 kW standby but serve different fuel infrastructure situations. The diesel DS200 is more compact and has higher fuel energy density per gallon, but requires diesel fuel storage. The GS200 eliminates diesel storage and uses utility gas supply. The GS200 is significantly heavier (6,258 vs approximately 3,500 lb) and larger.
What gas supply pressure is required for the GS200?
Vaporous supply (NG or LP vapor): 178–279 mm H2O (7–11 inches of water column). The 2-inch NPT inlet connection handles the higher flow rate required at 200 kW.
Is the GS200 available with UL 2200 listing?
Yes, UL 2200 and CSA certification are available as options for the 208V and 240V voltage configurations.
What engine powers the MTU 6R0185 GS200?
A Doosan 11.1L CAC — an 11.1-liter, 6-cylinder inline turbocharged and charge-air-cooled spark-ignition engine producing up to 225 kWm gross on natural gas. EPA certified with a 3-way catalyst.
What warranty does the GS200 carry?
Standard 2-year factory warranty through MTU Onsite Energy authorized distributors.

Compatible equipment

Similar models

MTU

MTU 6R0135 GS150

150 kW natural gas standby (100 kW on LP). Doosan 8.1L with 3-way catalyst, dual-fuel NG/LP capable. No diesel storage needed.

150 kW standby · Natural Gas / LPG · Liquid-cooled

150 kW natural gas standby generator with Doosan 8.1L CAC 6-cylinder inline turbocharged engine, 3-way catalyst, EPA certified, dual NG/LP vapor capable.

EPA Non-Road Spark Ignition3-phasecommercial-standbylight-industrial

MTU

MTU 10V0183 GS350

350 kW NG standby (245 kW LP) on Doosan 18.3L V10. Dual-fuel capable, 3-way catalyst, eliminates diesel storage at mid-range power.

350 kW standby · Natural Gas / LPG · Liquid-cooled

350 kW natural gas standby generator with Doosan 18.3L CAC V10 turbocharged engine, 3-way catalyst, EPA certified, dual NG/LP capable. 4369 x 2506 x 2413 mm.

EPA Non-Road Spark Ignition3-phasecommercial-standbyindustrial-standby
Caterpillar Cat DG200 200 kW liquid-cooled standby generator

Caterpillar

Cat DG200

200 kW natural gas with CAT DG200. No diesel storage needed. EPA certified for demand response. ~200 US dealers.

200 kW standby · Natural Gas / LPG · Liquid-cooled

200 kW natural gas generator with 10.3L V8 engine. Emergency standby, demand response, and prime power for commercial and industrial applications.

3-phasecommercial-standbydemand-response

Need service or parts for the MTU 6R0185 GS200?

We service every major OEM and stock genuine parts for the most common models.